Hi Alex,
Plan Taylor rack by rack, before the steel goes up.
Congrats on the Taylor approval. Spire gives your build and ops teams one live model of the campus, from first design through to day one.
Book a 20-minute intro call →
Steve's video for Alex · 1 min
What I noticed
- Taylor is approvedThe development agreement passed on October 8: up to 1 GW on 664 acres, with first power targeted for the first half of 2028.
- Power planned in from day oneDedicated power behind the meter, designed in from the start rather than added later.
- A new build and ops benchNew Presidents for Development & Construction and for Operations, appointed in September.
One model, from design to day one
Your Turnkey model runs design, construction, commissioning and handover. Spire follows the same path.
Design
Plan the halls
Lay out space, power and cooling in 3D before ground breaks, so capacity is planned, not guessed.
Build
Track every asset
Follow equipment from delivery to install to commissioning, in one place your contractors can use.
Run
Hand over clean
Ops gets a live twin on day one, with nothing lost between the construction team and theirs.
A short look at Spire
In 25 years managing and operating data centre white space. Spire is the first platform that has truly delivered on promises made during the sales process.
Financial Sector Global BankNVIDIADeloitteAccentureServiceNowCBRECiscoAWSMicrosoft